Indoor carpet pitches are generally preferred because they give us the right to use all four seasons. Although it is closed, of course, it must be in systems that will illuminate and heat the interior. Indoor carpet pitch is made in three ways as tarpaulin covering, Integral panel covering or trapezoidal sheet covering. The ones that are most preferred recently are the ones that are combined with steel constructions on the top and the side parts can be opened and closed according to the seasonal conditions. In summer, it is manually opened up to 3 meters and air circulation is provided.
What Is Reform Spor Carpet?
To play football, artificial grass carpet and so on. These are areas covered with a special material and surrounded by wire mesh. Carpet pitches have artificial or natural grass, sandy ones, and rubber-based ones. Carpet pitches are becoming more diversified by adding many features such as indoor carpet pitches with indoor ceilings, spectator seats, cafe, waiting room, locker room, night lighting, goal announcement, camera in order to be protected from bad weather conditions. All these are factors that affect the cost of indoor carpet pitch construction.
Carpet pitches are divided into three as indoor astroturf, outdoor astroturf and multi-purpose astroturf pitches. Our company builds all of these types professionally and keeps the turnkey carpet pitch prices at the most reasonable level for you.
Indoor Field Construction and Stages
Indoor carpet pitch dimensions are made between 20 – 30m width: 40 – 60m, and are built according to the dimensions of the area to be applied and the preferences of our customers. Generally, the preferred size is 30×50 carpet pitch, and the cost of 30×50 carpet pitch varies accordingly. The construction of a carpet pitch takes about 1.5 months, except for unexpected situations. The most important part of these processes is spent on infrastructure works. Because an error in the infrastructure will affect the entire field and will not provide the necessary comfort to you, and will add extras to the cost of indoor carpet pitch construction.
Indoor Infrastructure Works
Infrastructure preparations take about 3 days and it takes an average of 12 days to build as it cannot be worked simultaneously. During this time,
- Concrete beam should be placed securely by connecting Plywood formworks.
- The subfloor should be compacted thoroughly and the excavation should be cleaned.
- The gravel soil layers should be spread evenly and screed.
- Concrete and asphalt floors should not have ripples.
- The molds are tied around the field according to the determined dimensions. Mesh should be made by using 10 and 12 Q iron bars inside.
- After the iron mat is placed, drainage pipes with a depth of 30 cm should be placed at certain intervals and thus the water should be evacuated. Here
- It should be noted that the slope of the drainage pipes is placed with an outward slope.
- On gravel floors, discharge pipes should be placed in the beam at 8m intervals.
- Water is discharged from the surface by giving a slope of 0.05% on concrete floors and asphalt floors.
- Anchor sheet plates should be placed on the concrete with studs at certain intervals inside the perimeter beam.
- BS20 ready-mixed concrete should be poured into the perimeter molds.
- Afterwards, gravel filling should be done on the field floor.
Indoor Superstructure Works
The assembly of steel construction and painting processes takes an average of 10 days. The steel construction modular system must have been produced in the factory environment. The fixed system is cut according to the measurements in place and welding is done. Since carpet pitch steel construction prices will vary depending on the area to be applied, it is not correct to say a clear price. You can find out the most suitable carpet pitch construction cost for you by contacting us.
Double vertical pipes connected to each other should be welded to the sheet metal plates placed in the perimeter beam.
Trusses are mounted on vertical posts.
Pipes are mounted on the scissors at intervals determined horizontally.
Projector connection pipes are installed on the right and left sides of the field.
When the construction is finished, the top of the field is covered with tarpaulin or glass fiber materials.
1 hinged door is placed on the appropriate part of the field.
Two goal posts will be mounted in their places.
The area will be covered with galvanized and PVC coated wire mesh.
When the wire mesh is covered by tension, a steel rope will be stretched on it and connected with terminals.
In indoor carpet pitch construction, the sides will be covered with nets made of polyamide yarn in the range of 12×12 cm and the ceiling nets in the range of 15×15. The nets of the goals must be of 12x12cm and 4mm nets.
It will be mounted on projector poles.
Lighting projectors are fixed by adjusting their angles and spacing to illuminate the entire field. 400w metal halide projectors and 200w LED will be installed in their places and finally artificial grass is laid.
Project with synthetic grass helmetin cloth and PU glue produced from special PE raw material, with high resistance UV additive and suitable for football performance. Then, it is filled with sand and granule filling materials in accordance with FIFA criteria, and the final stage is passed. After leveling and brushing, the game is brought ready to play.
Products Used in Indoor Carpet Field Construction
Reform Spor should be your first choice on the basis of companies that manufacture carpet pitches. All the materials we use are our own production and premium quality products are used. This promises you, the project owners, long years of trouble-free use. This is a kind of investment and can pay for itself in a short time.
Indoor floor is not suitable for natural grass, as there are no sun-drenched areas. For this reason, we use our grass carpets of high quality. In these carpets, the pile height should be selected according to the request and the area to be made. This selection should be between 40mm and 60mm pile lengths. The yarn quality of artificial turf is directly related to factors such as monofilament, yarn density, and whether it has a spine. Instead of SBR granules for indoor carpet pitch, gray granules or green granules will increase the comfort and increase the cost.
Indoor Cost Factor
The material options to be used for indoor stadium construction depend on different criteria such as their usage amounts and material quality. These criteria, which start with the size of the area, are shaped within the framework of the quality of the artificial grass and other evenings used, infrastructure works, meteorological conditions, preferred roof and lighting systems. In the light of these, it will be sufficient to send us your draft projects so that we can calculate the average cost for you in the shortest way. Our technical team in Reform Spor will provide you with the cost of indoor carpet pitch you are looking for with a detailed meeting with you. If you are looking for a company in Istanbul, you are at the right place. Integral Spor quality is chosen not only in Istanbul but all over the world.