Tartan Multipurpose Court

Tartan Multipurpose Fields are preffered by schools and building complexes which enables playing football, basketball and voleyball games on the same surface. These fields are constructed within 3-4 weeks with the sizes of 18×36 m.

Tartan Multi Purpose Courts Building and Features

Tartan floor multi-purpose field dimensions are 18m x 36m generally accepted. We produce granule in our factory for multi-purpose pitches, at “Reformsports”. Tartan floor multi-purpose field colors can be made as desired. Tartan is usually done as floor to be cast in layers of 5mm and 8mm SBR and EPDM layer. Thicker tartan floor molding is also available. Please ask the tartan floor price

Tartan Multipurpose Court, Tartan Floor

Tartan Multipurpose Court

Tartan Multipurpose Court Cut Section

Tartan Multipurpose Court Cut Section

TARTAN MULTI – PURPOSE COURT TECHNICAL SPECIFICATIONS

STAGE 1 SUB-BASE :

a) Excavation: The field will be excavated and levelled. The canals will be excavated arround the field to build a concrete boundary.
b) The boundary will contain 8-12 iron bars.
c) 3” anchorage iron pipes will be fixed on the surface of the boundary.
d) BS 20 Ready concrete will be poured in the moulds.
e) The entire surface will be filled with gravel.
f) The gravel surface will be covered by a flat concrete or asphalt layer.

STAGE 2 FENCING :

a) Iron columns will be welded vertically to anchorages fixed in the boundary. The horizontal top, mid and bottom iron pipes will be welded to the these columns.
b) Reinforcement pipes will be welded diagonally to the horizontal pipes at each corner. The columns also will be reinforced by additional columns.
c) To reinforce the sides, crosswise pipes will be welded to the side colomns and the columns on the back of goal posts.
d) The lighting columns will be established with stairs on the lengthwise side of the pitch.
e) A hinged door will be constructed for the field
f) A set of volleyball net and net holders together with a set of basketball baskets will be installed.
g) All the iron material will be painted with undercoat and oil paint.
h) The field sides will be fenced with galvanised, PVC coated 4×4 cm pores wire-fence.
i) The fence will be reinforced with kink attached to the tie clips on the columns.
j) 400 W Lighting projectors will be fixed on the Lighting columns.
k) The electricity cables will be extended upto board and will be delivered in working condition.

STAGE 3 : TARTAN SURFACE

a) A linear layer will be applied on the asphalt/concrete surface.
b) Tartan material will be installed by a special machinary.
c) The basketball and volleyball game lines will be marked out.

 

Tartan Multipurpose Court Dimensions

Tartan Multipurpose Court Dimensions

Tartan Multipurpose Court Applications

Tartan Multipurpose Court Applications